I. Introductory Provisions

  1. These General Terms and Conditions (the “GTC”) govern the supply of machinery, equipment, spare parts and related services, in particular erection, installation, commissioning and servicing (together the “Delivery”), by Engel - Gematex s.r.o. (the “Supplier”) to the purchaser (the “Purchaser”). The GTC apply exclusively to contracts with entrepreneurs concluded in the course of their business activities.
  2. The GTC form part of the contract if the Supplier’s offer or order confirmation refers to them. The GTC are freely available for download on the Supplier’s website www.engel-gematex.com and will be sent to the Purchaser free of charge on request.
  3. Provisions agreed in the offer, the order confirmation or the contract take precedence over the GTC.
  4. The Purchaser’s terms and conditions become part of the contract only with the Supplier’s express written consent, even if the Supplier performs with knowledge of them.
  5. The Purchaser expressly accepts also those provisions of the GTC which it could not reasonably have expected, in particular the retention of title (Article V), the contractual penalty and the limitations of liability (Article VI(7) and Article XI), the shortened limitation period (Article X(5)), the exclusion of international conventions and the choice of court (Article XIII).

II. Conclusion of Contract and Scope of Delivery

  1. The Supplier’s offers are non-binding unless they state a period of validity.
  2. The contract is concluded by the Supplier’s written order confirmation or by the Supplier commencing performance. The written form is also satisfied by communication by e-mail.
  3. By accepting the Delivery or paying the price, the Purchaser confirms its agreement to the GTC.
  4. The scope of the Delivery is determined by the Supplier’s order confirmation or, if none has been issued, by the Purchaser’s order to the extent of the Supplier’s offer. Protective devices form part of the Delivery to the extent required by law or expressly agreed.
  5. The Delivery complies with the requirements of the legislation of the European Union, in particular the legislation on machinery, and with harmonised standards as in force on the date of the order confirmation. The Supplier warrants compliance with the regulations of any other country of destination only if expressly agreed.
  6. Drawings, cost estimates, technical documentation and software remain the property of the Supplier, which also holds all intellectual property rights therein. The Purchaser may make them available to third parties only with the Supplier’s prior written consent. For software forming part of the Delivery, the Purchaser obtains a non-exclusive licence to use it solely for operating the delivered equipment; the licence passes together with the equipment to any acquirer.
  7. The Supplier reserves the right to make technical changes that do not impair the functionality or the utility of the Delivery.

III. Price

  1. Prices are stated in the currency of the offer, exclusive of value added tax, and apply to the delivery term agreed under Article VI(1).
  2. Prices exclude packaging unless otherwise stated in the offer or order confirmation; for the delivery terms FCA or DAP, packaging suitable for the agreed mode of transport is included in the price.
  3. Erection, installation and commissioning are included in the price only if stated in the order confirmation; otherwise they are charged in accordance with Article VIII(6).

IV. Terms of Payment

  1. Payment terms and advance payments are governed by the offer or order confirmation; otherwise the price is due within 14 days of the invoice date.
  2. Payments shall be made without deductions to the Supplier’s account; bank charges on the payer’s side are borne by the Purchaser.
  3. In the event of late payment, the Purchaser shall pay default interest at the reference rate of the European Central Bank plus 8 percentage points.
  4. If the Purchaser is in default of payment, the Supplier may suspend further performance; the Supplier’s time limits are extended by the period of the Purchaser’s default.
  5. The Purchaser may set off only claims that are undisputed or have been finally established by a court.
  6. Where the Purchaser arranges transport (in particular under the delivery terms EXW and FCA), it shall provide the Supplier, within 10 days of collection, with documents evidencing transport of the goods to another EU Member State, in particular a confirmed CMR consignment note and a confirmation of receipt of the goods at the destination. If it fails to do so, it shall reimburse the Supplier for value added tax and all related penalties.

V. Retention of Title

  1. The Delivery remains the property of the Supplier until the purchase price for that Delivery has been paid in full.
  2. Until then, the Purchaser may not pledge the Delivery or transfer it by way of security; it may resell it only in the ordinary course of business.
  3. If the Delivery is located in another country, the Purchaser shall, at the Supplier’s request, provide the cooperation necessary for the retention of title to be effective in that country.
  4. The Purchaser shall inform the Supplier without undue delay of any interference by third parties with the Delivery, in particular enforcement measures; the costs of protecting the Supplier’s rights are borne by the Purchaser.

VI. Delivery Terms and Time Limits

  1. The delivery term is governed by the offer or order confirmation in accordance with Incoterms® 2020. If no delivery term is agreed, EXW Sezemice (Incoterms® 2020) applies.
  2. Under the delivery terms EXW or FCA with the Supplier’s works as the place of delivery, loading is carried out by the Supplier at the risk and responsibility of the Purchaser.
  3. For exports outside the European Union, the Supplier carries out export customs clearance at the Purchaser’s expense, including under the delivery term EXW.
  4. The delivery time starts upon the order confirmation, but not before the Supplier has received the agreed advance payment and all documents, information and approvals to be provided by the Purchaser.
  5. The delivery time is met if readiness of the Delivery for handover is notified to the Purchaser within that time (EXW, FCA), or if the Delivery arrives at the place of destination within that time (DAP and similar delivery terms).
  6. If performance is prevented by circumstances beyond the Supplier’s control (force majeure), in particular war, riot, strike, lockout, epidemic, natural disaster, shortages of materials or energy, measures of public authorities or sanctions, time limits are extended by the duration of such circumstances plus a reasonable period to resume performance. If the impediment lasts longer than 6 months, either party may withdraw from the contract with respect to the part not yet performed.
  7. Contractual penalty: If the Supplier is in delay for reasons other than those under paragraph 6 and the Purchaser demonstrates that it has suffered damage as a result, the Purchaser may claim a contractual penalty of 0.5% of the price of the delayed part of the Delivery for each full week of delay, but not more than 5% of that price. The contractual penalty is the Purchaser’s sole remedy for the Supplier’s delay, unless the delay was caused intentionally or by gross negligence.
  8. The Purchaser may withdraw from the contract due to the Supplier’s delay only after the fruitless expiry of a reasonable additional period granted to the Supplier in writing.
  9. If handover or dispatch is postponed at the Purchaser’s request or for reasons attributable to it, the Supplier may, beginning one month after notification of readiness, charge storage fees of 0.5% of the price of the Delivery for each month or part thereof, up to 5% of the price of the Delivery, or proven higher costs.
  10. Partial deliveries are permitted.

VII. Transfer of Risk

  1. The risk of loss of or damage to the Delivery passes to the Purchaser in accordance with the agreed Incoterms® 2020 delivery term.
  2. If the Purchaser is in default of acceptance or dispatch is postponed for reasons attributable to it, the risk passes to the Purchaser on the fourth day after notification of readiness of the Delivery for handover. From that day the Supplier stores the Delivery at the Purchaser’s risk and is liable for its loss or damage only in the event of intent or gross negligence; the right to storage fees under Article VI(9) remains unaffected.
  3. Transport insurance beyond the agreed delivery term is arranged by the Supplier only at the Purchaser’s request and expense.

VIII. Erection and Installation

  1. Where the Supplier carries out erection or installation, the Purchaser shall in good time and at its own expense provide in particular: (a) structural readiness, foundations and access routes, (b) electricity, compressed air, water and other media, including connections up to the place of installation, (c) lifting and handling equipment and auxiliary personnel, (d) dry and lockable rooms for storing parts and tools and adequate welfare facilities for the fitters, (e) information on the location of concealed lines and data on the structural statics of buildings and structures at the place of installation.
  2. The installation site must be prepared so that installation can begin immediately upon arrival of the fitters and proceed without interruption.
  3. The Purchaser shall instruct the Supplier’s fitters on the risks at the workplace and the occupational safety rules applicable at the installation site and shall provide any special personal protective equipment required by local conditions.
  4. Waiting times, interruptions and additional journeys of the fitters caused by the Purchaser or by circumstances on its side are charged to the Purchaser in accordance with the Supplier’s current price list for services.
  5. The Purchaser shall confirm the fitters’ working hours weekly and shall confirm completion of the installation in writing without undue delay.
  6. Unless erection or installation has been agreed at a fixed price, it is charged on a time-and-material basis: hours worked including surcharges for overtime, night, Saturday, Sunday and public-holiday work, travel time, travel costs, accommodation and per diems, all in accordance with the Supplier’s current price list for services.

IX. Acceptance

  1. The Purchaser shall inspect a Delivery without installation without undue delay after delivery. Visible defects and transport damage shall be notified to the Supplier in writing within 7 days of delivery; transport damage shall also be noted on the transport document.
  2. A Delivery with installation or commissioning is accepted by the Purchaser by means of an acceptance protocol upon completion of installation or, where agreed, after a trial run.
  3. The Delivery is deemed accepted on the day on which (a) the Purchaser starts using it, or (b) the Supplier notifies completion and any remaining defects and outstanding work do not prevent operation, or (c) 14 days have passed since the Supplier’s request for acceptance without the Purchaser having notified in writing a defect preventing operation.
  4. Defects and outstanding work that do not prevent operation are no reason to refuse acceptance; they shall be recorded in the acceptance protocol together with a deadline for their remedy.

X. Defects and Warranty

  1. The Supplier provides a quality guarantee of 12 months unless otherwise stated in the order confirmation. The guarantee period runs from handover: for a Delivery without commissioning, from the date of notification of readiness for handover (EXW, FCA) or from the date of delivery at the place of destination (DAP and similar delivery terms); for a Delivery with commissioning, from the date of acceptance under Article IX, including deemed acceptance under Article IX(3). For a Delivery under DAP or a similar delivery term and for a Delivery with commissioning, the guarantee period starts no later than 6 months after the date of notification of readiness for handover if delivery, installation or acceptance is delayed for reasons attributable to the Purchaser.
  2. The Purchaser shall notify the Supplier of a defect in writing without undue delay after discovering it, and no later than by the end of the guarantee period, describing the defect and how it manifests itself.
  3. In the case of a justified claim, the Supplier shall, at its option, remedy the defect by repair or by supplying a replacement part or a replacement delivery. Replaced parts become the property of the Supplier.
  4. If the Supplier fails to remedy the defect within a reasonable additional period granted to it in writing by the Purchaser, the Purchaser may claim a reasonable price reduction; in the case of a fundamental breach of contract, it may withdraw from the contract.
  5. The Purchaser’s rights arising from defects become time-barred 12 months after the date on which the defect was notified.
  6. The Supplier provides a guarantee of 3 months on repairs and 6 months on replacement parts, but at least until the end of the original guarantee period.
  7. The guarantee does not cover, in particular, normal wear and tear and consumable parts, nor defects caused by failure to follow the operating and maintenance instructions, unsuitable operating materials or media, excessive load, improper interventions by the Purchaser or third parties, use of non-original parts, or by documents, materials or instructions provided by the Purchaser.
  8. The Purchaser may withhold payment only to an extent proportionate to the notified defect and only if the claim is manifestly justified.
  9. If a claim proves unjustified, the Purchaser shall pay the Supplier for the work performed in accordance with its current price list for services and for the costs incurred, in particular travel costs and materials.

XI. Liability for Damages

  1. The Supplier’s total liability for damages arising from or in connection with the contract is limited to an amount equal to the price of the relevant Delivery. For delay in delivery, the Supplier is liable only for the contractual penalty under Article VI(7).
  2. The Supplier is not liable, in particular, for loss of profit, loss of production or output, downtime, loss of orders and customers, contractual penalties and damages paid by the Purchaser to third parties, loss of or damage to data, costs of substitute equipment or cover purchases, nor for any other damage not occurring to the Delivery itself.
  3. The limitations under paragraphs 1 and 2 do not apply to the extent that the law does not permit liability to be limited or excluded, in particular for damage caused intentionally or by gross negligence, for injury to life or health and for liability for damage caused by a defective product.
  4. The limitations under this Article also apply in favour of the Supplier’s employees, representatives and subcontractors.
  5. This Article applies to all claims of the Purchaser for damages irrespective of their legal basis, including claims arising from advice, from contract negotiations and from non-contractual liability.

XII. Material Change of Circumstances and Impossibility

  1. If, after conclusion of the contract, prices of materials, energy or transport rise substantially, customs duties change or sanctions are imposed that make the Supplier’s performance significantly more difficult, the parties shall negotiate a reasonable adjustment of the price or time limits. If they fail to agree within 30 days, the Supplier may withdraw from the contract with respect to the part not yet performed.
  2. If performance becomes impossible, the Purchaser may withdraw from the contract; claims for damages are governed by Article XI.

XIII. Governing Law and Disputes

  1. The contract and the legal relationships arising from it are governed by the laws of the Czech Republic, in particular Act No. 89/2012 Coll., the Civil Code.
  2. The application of the United Nations Convention on Contracts for the International Sale of Goods (Vienna, 1980) and of the Convention on the Limitation Period in the International Sale of Goods (New York, 1974) is excluded.
  3. Disputes arising from or in connection with the contract shall be decided by the general courts of the Czech Republic; the court competent for the Supplier’s registered office has local jurisdiction. The Supplier may also bring an action before the court competent for the Purchaser’s registered office.

XIV. Final Provisions

  1. The GTC are issued in Czech, English and German. The language version in which the order confirmation is issued is binding.
  2. The parties shall keep confidential the commercial and technical information of the other party obtained in connection with the contract.
  3. The Purchaser shall not resell, export or make available the Delivery in breach of the sanctions and export control regulations of the European Union. The Supplier is not obliged to perform if such sanctions or regulations prevent it.
  4. Should any provision of the GTC or of the contract be invalid or ineffective, the remaining provisions remain unaffected; the parties shall replace it with a provision that comes closest to the purpose of the invalid provision.
  5. This version of the GTC, CZ-2026-10-19, is effective from 19 October 2026. Contracts concluded before that date are governed by the GTC in the version effective at the time of their conclusion.

Start your project today

By submitting this form, you acknowledge that wewill process your data to respond to your enquiry. More in our Privacy Policy.

Thank you!
Your submission has been received!
Oops! Something went wrong while submitting the form.

How can you contact us?

  • We respond within 24 hours.
  • Direct contact with our team—no bots.
  • We ask the right technical questions right away.